TS3 Stage Rails LONG
Catalogue no.: 0825
Rails for the 2m side of the stage
Technical Specification
- attached via rail support bolt
Description
TOMKOstage system offers an easy and fast solution of setting up stage rails. How to mount the rails: the screws around the perimeter of the stage that connect legs and decks are replaced by rail support bolts. Rails can then simply slide on and are secured by small screws preventing their removal. Stage rails are connected between one another by rail connectors so that they won´t shift apart.
If the stage is higher than 0,6m it is recommended to use the rails. Above the stage height of 1,5m the rails are required.
Assembly Guide for Stage Rails
This assembly instruction for a standard
modular stage 2x4m with accessories.